ARE 5.0 Contract Scenario Simulator

ARE 5.0 Exam Prep · Interactive Tool · Updated June 2026

ARE 5.0 Contract Scenario Simulator

Pick a real-world construction situation. The simulator walks you through which contract applies, who is responsible, and what happens next — exactly the way the ARE tests it.

CEPjMA201 · G701

The owner wants to add a skylight mid-construction

Construction is underway. The owner calls the architect and says they want to add a skylight that was not in the original drawings. What happens next?

Run this scenario →

CEA201 · G704

The contractor says the project is substantially complete

The contractor notifies the architect that the building is ready for occupancy. There are still some punch list items remaining. What does the architect do?

Run this scenario →

CEPjMA201 · G702

The contractor submits a pay app the architect thinks is too high

The contractor submits Application for Payment No. 6. The architect believes the contractor has overbilled for work not yet complete. What are the architect’s options?

Run this scenario →

CEPjMA201 · G714

The owner needs work done but the contractor won’t agree on price

The owner wants to proceed with a scope change immediately. The contractor refuses to agree on a price. The project schedule is at risk. What can the architect do?

Run this scenario →

CEA201 · §10.3

Workers find a buried fuel tank during excavation

During excavation, the contractor discovers a buried fuel tank that may involve hazardous material. Work stops. Who is responsible and what happens next?

Run this scenario →

PcMPjMB101 · C401

The structural engineer makes a serious design error

A structural beam was undersized by the structural engineer. The error is discovered during construction. The fix will cost $80,000. Who pays?

Run this scenario →

PcMB101

The owner asks the architect to skip construction administration

To save money, the owner asks the architect to provide design services only and skip CA entirely. The architect agrees. The project is built. Issues arise. What is the architect’s exposure?

Run this scenario →

PjMA141 · B143

The architect is hired by a contractor on a design-build project

A general contractor wins a design-build contract and hires an architect to provide design services. A dispute arises between the owner and the design-build team. Whose side is the architect on?

Run this scenario →

CEA201 · Article 15

The contractor files a claim against the owner

The contractor believes the owner caused a 3-week delay and submits a formal claim for additional time and compensation. What is the process under A201?

Run this scenario →

CEPjMA201 · A101

The contractor misses the substantial completion date

The contract required substantial completion by November 1. It is now November 20 and the building is still not substantially complete. The contract includes liquidated damages. What happens?

Run this scenario →

PcMPjMB101

The owner keeps changing the design — who pays for redesign?

The owner has changed the building layout three times after schematic design was approved. The architect has spent 40 extra hours on redesign. Can the architect charge for this?

Run this scenario →

CEA201 · Article 9

The owner refuses to pay the contractor

The architect certified a payment of $120,000. The owner refuses to release the funds, saying the work quality is unacceptable. What are the contractor’s rights under A201?

Run this scenario →

The situation

Exam takeaway

Common exam trap